| 6.Once the installers arrive the tear-out process begins. This includes removal of your old doors, drawers and countertops.
|
7. Since our frames are already assembled and finished attaching them is as simple as nailing them on (from the inside). No other prep work is needed.
|
8. Side panels, bottom panels and moldings are also nailed on.
|
9. New drawers with drawer slides are installed.
|
10. Attaching new doors, drawer fronts, hardware and countertops completes the project.
|
|
Back
|